St. Ann Municipal Corporation Office of the Contractor General November 2017

Lydia Morris

Ms. Lydia Morris was awarded a total of five (5) contracts for the period under review by the St. Ann Municipal

Corporation. The contracts had a cumulative value of $1,189,900.00. Ms. Morris appeared before the Contractor

General on October 22, 2015 and provided the following statements in respect of the contracts which were

awarded to her:

“CHAIRMAN:

Start first with a contract which is

dated the 29th of November 2012, it was

completed on the 6th of December, 2012,in

the sum of One Hundred and Fifty Thousand

Dollars. I am going to show it to you in a

minute, ma'am. It provides labour, tools,

machete, shovels, wheelbarrows, pickaxe,

de-bush and remove heavy and thick

overgrowth from both sides of roadway and

side drains. Excavate to heavy accumulated

silt and debris, get out some, to clean and

clear sides drain and outlets, gather and

heap spoil and cart away same from site as

detected. It is for 750 meters at Two

Hundred Dollars per meter. Work done

there at - it says road No. 86, Ballimony,

Road No. 333 Cowley and sections of the

Alderton Main Road. I am going to have the

document shown to you now, madame.

(Document shown to Ms. Lydia Morris)

CHAIRMAN:

Can you tell me first, when you get the

document, if you recognize the signature

there, madame?

A:

I think so.

CHAIRMAN:

Is that your signature, madam?

A:

Yes, sir.