Page
520
of
554
St. Ann Municipal Corporation Office of the Contractor General November 2017
Rec.
Name of
Contractor
Contract
Date
Contract
Duration
Contract
Description
Source
of Funds
Quantity
and Rate
Cheque
Date
Cheque
Value
$
Amount
reflected on
Contract
$
Name of
Officer Who
endorsed work
as
satisfactorily
Completed
Remarks
Re: the
collection
of the
Cheque
Examination
by Internal
Auditor
Higgin Town,
Ferncourt
Street,
Beechamville,
Golden Grove
main road,
Bumper Town
to Coultart
Grove
23.
Sandra
Garrick
December
3,2012
December 3,
2012
through to
December
12, 2012
Provide labour
and tools
(machete,
shove, hoe,
pickaxe, rake)
Debush and
remove heavy
and thick
overgrowth
from both sides
of roadway and
side drains.
Excavate into
accumulated silt
and debris to
clean and clear
side drains and
outlet. Gather
and heap spoil
and cart away
same from site
as directed.
Work done at
Heart to
Beechamville,
UDC Pond to
CDF
Infrastru
cture &
Repairs
2100m @
$200
December
17, 2012
420,000.00
420,000.00
Alwyn Brown
The
signature of
the payee
appears to
be affixed
on the back
of the
cheque. The
cheque was
also
stamped by
the Bank of
Nova
Scotia, St.
Ann’s Bay
on
December
18, 2012.
The Payment
Voucher was
stamped as
having been
examined by
the Internal
Audit Dept.